Reference List

zadania 1Main Projects executed by HPR SA:

  • Construction of the boiler with auxiliary installations – utilization of the wastes in the paper factory PROPOWER HKW EISENHUTTENSTADT-GERMANY.
  • Construction of the boiler with auxiliary installations – utilization of the wastes in the paper factory LEIPA in SCHWEDT-GERMANY.
  • Construction of the Discharge Nozzles, Ladle Stoppers and Slider Gates Production Plant in Skawińskie Zakłady Materiałów Ogniotrwałych (Refractory production Plant in Skawina).
  • Prefabrication and installation of the process equipment for the river-lock SMOLICE on Vistula River.
  • Construction of the derivation pipeline DN 2440 at the Water Dam ŚWINNA PORĘBA.
  • Erection of the waste gases desulphurization installation in Heat Plant Skawina.
  • Construction of the Walking Beam Furnace in the New Hot Strip Mill ARCELORMITTAL POLAND S.A. Cracow branch office.
  • Exchange of the gate crane Q=23T in the water stage of fall PRZEWÓZ in Cracow.
  • Repair of the boilers and turbine sets in the Power Plant of ArcelorMittal S.A. Cracow branch office.
  • Repairs of the water, heat, gas and sewage installations ArcelorMittal S.A. Cracow branch office.
  • Repairs of the civil structures (buildings) in ArcelorMittal S.A. Cracow branch office.
  • General revamping and repair of the Blast Furnace no 5 in BF Plant of Sendzimir Metallurgical Plant Cracow.
  • Repair of the Blast Furnace no 3 in BF Plant of Sendzimir Metallurgical Plant Cracow.
  • Revamping repair of the Converter no 1 in the Steel Plant of Sendzimir Metallurgical Plant Cracow.
  • Repair of the waste-heat boilers in the Steel Plant of Sendzimir Metallurgical Plant Cracow.
  • Repairs of the utility/power installations in the Steel Plant and Blast Furnace Plant of Sendzimir Metallurgical Plant Cracow.
  • Repair of the water boiler in Heat Plant Łęg in Cracow.
  • Repairs of the shaft furnaces in Refractory Production Department in Sendzimir Metallurgical Plant Cracow.
  • Repair of the rotary furnace in Refractory Production Department in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the pusher furnaces in Sendzimir Metallurgical Plant Cracow.
  • Repair of the liquid pig-iron mixers in Steel Plant in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the wagon tipplers in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the industrial stacks in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the Ball mills in the Power Plant of Sendzimir Metallurgical Plant Cracow.
  • General repairs of the pickling pots in the Car Body Steel Mill in Sendzimir Metallurgical Plant Cracow.
  • General and periodical repairs of the rolling mills in Sendzimir Metallurgical Plant Cracow.
  • General and periodical repairs of the sinter belts in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the dry quenching of coke in the Coke Plant in Sendzimir Metallurgical Plant Cracow.
  • Repairs and revamping of the waste-heat boilers in the Coke Plant in Sendzimir Metallurgical Plant Cracow.
  • Repairs of the dedusting installations in the Coke Plant in Sendzimir Metallurgical Plant Cracow.
  • Repairs and revamping of the preliminary cooling chambers of the gas in the Coke Plant in Sendzimir Metallurgical Plant Cracow.
  • Construction of the high storage stock in Car Factory (FSO) Warsaw.